How much does pool construction cost in 2026?

The most common question we hear from people planning a swimming pool is: "How much will the whole thing cost?" The honest answer is. It depends. But not in the way companies say who don't want to reveal their prices. In this article, you will find realistic price ranges by item so you know what to expect before you start requesting quotes.

Quick overview by pool type

Prices apply to an in-ground pool 7×3 m with basic equipment (filtration, piping, skimmer, lighting), including excavation and concrete slab:

Pool typePrice from
Liner pool with skimmer (steel or concrete frame)approx. 550 000 Kč
Concrete hand-dug (custom-made reinforced concrete shell)approx. 950 000 Kč
Overflow (water level flush with paving)approx. 1 400 000 Kč

Self-supporting plastic pools for in-ground installation can be found at lower prices (from approximately 350 000 Kč including installation), but with these, as with few others, the quality of installation and concrete encasement is decisive, money saved may return in the form of repairs.

What the price comprises

ItemRange
Excavation and earthworks (including soil removal)60 000-150 000 Kč
Foundation slab70 000-140 000 Kč
Pool shell by type250 000-900 000 Kč
Equipment: filtration, piping, equipment pit90 000-250 000 Kč
Heating: heat pump50 000-120 000 Kč
Roofing (optional)120 000-400 000 Kč

What influences the price most

Operation: annual costs to expect

Operating costs are part of the acquisition price. For an outdoor pool 7×3 m, budget approximately 15 000-30 000 Kč per year, electricity for filtration and heat pump, chemicals, water and occasional part replacement. A cover significantly reduces operating costs by retaining water temperature and cleanliness.

Why do quotes vary by 15-30%?

Two companies will typically quote prices for the same pool differing by hundreds of thousands. Reasons: different foundation technology, different additional items (soil removal, electrical installation, landscaping), and varying workload: a company with a full diary adds a surcharge. Therefore, it makes sense to have at least two offers, ideally three, and compare them item by item.

Let us compare the quotes for you. Describe your project once, and we will pass it on to vetted pool builders from Prague and the Central Bohemian Region. Within 48 hours you will receive the first of 2-3 itemised quotes, free of charge and without obligation.

Compare quotes for free

Related reading: Do you need a building permit for your swimming pool? · Skimmer or overflow?